Tooling is often where a good bead becomes a bad one. The material may have been placed correctly, but the finishing pass drags it away from the joint edge, leaves a hollow section or spreads it across the frame face. Tooling time matters Current Sika guidance says fire-rated sealant should be tooled as soon as possible after application, pressing it firmly against the joint sides and using a compatible tooling method. Bostik also specifies a short finishing window on its current fire-sealant products. Those timings are product-specific. They should not be turned into a universal fire-door rule. Do not chase perfection too late One common mistake is allowing the bead to skin and then trying to reshape it aggressively. At that point the finish can tear, drag or detach from the edge. The better approach is to place the material…

PROUDMAN PROFESSIONAL ACCESS

Coming Soon

The full technical content of the Proudman Fire Door Knowledge Centre is being moved into Professional Access.

Members will have access to complete technical guidance, specialist information and deeper Proudman FIX diagnostic material.

Pricing: TBC

Professional Access