Fire Door Installation Guide
Part 14 — Final Fire Door Installation Checks
By this stage, most of the work has been done. The frame is in. The door is hung and aligned.
Part 12 — Measuring & Setting Fire Door Gaps
By this stage, the door should already be hung and aligned properly in the frame. This isn’t the point where
Part 6— Preparing the Fire Door Leaf
Once the frame has been prepared, packed and fixed, the next stage is preparing the fire door leaf. This is
Part 8 — Fitting the Stop Lath
Once the door has been correctly aligned in the frame, the next stage is to fit the stop lath. This
Part 7 — Aligning the Door in the Frame
The frame is now installed. This is where we hang the door and find out what the installation is actually
Part 5 — Installing a Fire Door Frame
You’ve checked the opening. You’ve measured it at multiple points. You’ve checked the wall depth, the floor, the structure and
